
Zurich Airport offices
Office floors using local Miniservers as customer gateways, with room automation and energy monitoring.

References
Published reference projects from the Loxone network. Different building types, one architecture: local control, open interfaces and a single operating picture.
Reference projects published by Loxone. Photography and project information courtesy of Loxone Group and the named partners. Scope varies by site; these are not presented as projects delivered by us.

A 20-acre campus combining offices, training, hotel, logistics and a show home on one automation platform.
Scope
Offices, training, hotel, logistics and show home
Read case study
Two hundred luxury apartments on the Adriatic coast, with building-wide climate, lighting, shading and access.

A Michelin-listed restaurant where lighting scenes, climate and audio move with the service.

Office floors using local Miniservers as customer gateways, with room automation and energy monitoring.

A customer experience center integrating façade, shading, climate and lighting into one demonstration environment.

A vehicle experience center where lighting, climate, AV and access follow the visitor journey.

A dark-timber office building with automated lighting, shading and climate across the workplace.

A national lottery headquarters with a striking triangular façade, automated lighting and climate.

A flagship branch combining workplace, partner training and product experience.

A flagship branch for partner training and product experience.
More spaces
A closer look at the rooms and campuses the platform runs in.



Reference project library
Loxone reference projects, each delivered by the named partner.

An 11,034 m2 office campus with 31 Miniservers, 1,639 Loxone components and a 512 kWp PV facade.
Partner: casacom gmbh
Read the local case study
A room-by-room renovation with a Miniserver in every room, integrating entrance, bathroom, bedroom and terrace.
Partner: LOXHOME INTEGRACIONES, SL
Read the local case study
A fully automated city apartment with one glass panel per room for lighting, climate, curtains, sheers and audio.
Partner: ModoSmart Technologies Co. LLC
Read the local case study
A new-build restaurant with a fully integrated Loxone system, from design to control and cabling.
Partner: Floydcom s.r.o.
Read the local case study
A panoramic restaurant with two operating modes, centralising heating, ventilation, cooling and lighting.
Partner: Evora Smart s.r.o.
Read the local case study
28 apartments and common areas with lighting, shading, security and air conditioning on one platform.
Partner: CATEGORY a.s.
Read the local case study
A parish centre with a relighting system designed, supplied and commissioned for simple operation.
Partner: BV Nicro
Read the local case study
A 1,200 m2 open-plan office with a 360-degree glass facade and predictive shading control.
Partner: ELEKTROTECHNIK MACK GmbH
Read the local case studyCase studies and imagery come from published Loxone reference material. Each project was delivered by the named partner, not by NexBuild Automation.

Your building next
Tell us the building type, the systems in scope and the operator model. We will point to the closest reference and explain what would be different.
Cookies and analytics
We use Google Analytics and Microsoft Clarity to understand how the site is used. They load only after you accept analytics. You can change your choice at any time.Privacy policy.