Skip to content
Track spotlight with Loxone lighting control

Products

The hardware behind the intelligence.

From the Miniserver to the room controls, audio and energy — the Loxone product families that make the operating picture possible.

Product ecosystem

One platform, from the controller to the room.

The IBMS is built on Loxone hardware and software. These are the product families we specify, configure and commission.

Product information and imagery from Loxone product documentation. Specifications and availability are confirmed per project.

Loxone Miniserver controller

01 / Product family

Miniserver

The local brain of the building.

The Miniserver runs schedules, interlocks and sequences on site. It keeps the building working when the internet does not, and gives the platform a single source of truth at the edge.

  • Local control, no mandatory cloud
  • Scales from an apartment to a campus
  • Open interfaces to third-party systems
Explore this product line
Loxone Touch Pure wall control

02 / Product family

Control elements

One control element. Endless possibilities.

Touch Pure, Touch Pure Flex, Wall Display and Remote Air give each room a simple interface for lighting, climate, shading, audio and scenes.

  • Scene and room control
  • Temperature, CO2 and presence sensing
  • Works with the app and the Miniserver
Explore this product line
Loxone multiroom audio overview

03 / Product family

Audio

Multiroom audio, built in.

Loxone audio brings music, announcements and zone control into the same platform as lighting and climate — without a separate audio system.

  • Streaming and local sources
  • Room and zone control
  • Announcements through the building
Explore this product line
Track spotlight with Loxone lighting control

04 / Product family

Lighting

Light that follows the day.

Presence, daylight and scenes turn lighting from a switch into part of the building operation. DALI, DMX, KNX and Tree luminaires sit on the same platform.

  • Presence and daylight control
  • Circadian and scene lighting
  • DALI, DMX, KNX, Tree
Explore this product line
Person at a window with automated shading

05 / Product family

Shading

Shading that reacts before you do.

Automatic shading protects the room from glare and heat, responds to wind and sun, and becomes part of the climate strategy.

  • Solar tracking and wind protection
  • Scene and privacy control
  • Works with major motor systems
Explore this product line
Wall-mounted room climate sensor

06 / Product family

Climate

A healthy indoor climate.

Heating, cooling and ventilation are controlled room by room, with CO2 and humidity data driving the sequence rather than a fixed schedule.

  • Heating, cooling and ventilation
  • CO2 and humidity control
  • Room-by-room setpoints
Explore this product line
Modbus energy interface module

07 / Product family

Energy

Measure it. Then move it.

Metering, PV, storage and EV charging are brought into one energy model, with the controls to act on the data.

  • Metering and PV
  • Storage and EV charging
  • Baselines and load shifting
Explore this product line
Loxone access control panel

08 / Product family

Security & access

One system for every access.

Intercom, access events, NFC readers, alarm and CCTV share one event model, so a door event can trigger lighting, climate and video. We integrate access systems; we do not supply locks, readers or turnstiles.

  • Intercom and access events
  • NFC and code integration
  • Alarm, CCTV and access in one view
Explore this product line
Loxone dashboard and software interface

09 / Product family

Software & Exosphere

One software stack, from room to portfolio.

Config is the engineering environment, the app is the operator interface, and Exosphere adds portfolio-level monitoring for commercial teams.

  • Config for engineering
  • App for operators and residents
  • Exosphere for portfolio management
Explore this product line
City skyline at sunset

Next step

Specify the platform around the building.

Tell us the building type and the systems in scope. We will map the product families, interfaces and responsibilities.