
About
Engineering the intelligence layer.
We are the smart-building and IBMS practice of Loxone Intelligent Building (Zhejiang) Co., Ltd., combining Loxone's automation platform with building-systems engineering from Guangzhou.
01 / Who we are
A platform company's discipline, an engineering team's habits.
Legal entity
Loxone Intelligent Building (Zhejiang) Co., Ltd.
Engineering base: Guangzhou, China
Loxone Intelligent Building designs and delivers IBMS platforms for commercial, hospitality and residential projects. Our team works at the seam between the automation platform and the building’s existing systems: HVAC, lighting, access, security, energy and guest room control.
We are part of Loxone’s global ecosystem — a platform built since 2009, deployed through partners in more than 100 countries and used in more than 30,000 projects. That network gives our projects a mature product foundation; our own work is the architecture, configuration and commissioning that makes it fit a specific building.
Our engineering base is in Guangzhou, with project delivery across China and support for overseas developers, consultants and integrators.
Inside the work
Where the platform meets the building.



02 / Loxone Group at a glance
A global platform behind every project.
Group figures from Loxone's 2024 corporate profile. They describe the platform we build on, not the size of the China team.
2009
Loxone Group founded
Austria
27
branches worldwide
Group
1,000+
employees
Group
25,000+
partners
Group
100+
countries served
Group
30,000+
projects delivered
Group
03 / Design method
Five layers, from strategy to surface.
Adapted from the experience-design framework we use on every IBMS project. Each layer constrains the one above it.
Strategy
What the building must achieve for its owner, operator and occupants. Agreed before any screen is designed.
Scope
Which systems, data points, alarms and reports are in. What is explicitly out.
Structure
How operators move through the system: navigation, roles, permissions and escalation paths.
Framework
The layout of the operating picture: alarm hierarchy, floor plans, trends and command placement.
Surface
The visible interface: graphics, typography, colour and the details that make a command obvious.

The method applied to a building
04 / Principles
Four rules we do not negotiate.
Local first
Control and history stay in the building. The cloud is an option, not a dependency.
Open by default
BACnet, Modbus, KNX, DALI, API. The building’s data is the owner’s data.
Operator first
Designed for the person on shift, not the integrator’s demo.
Evidence over claims
Targets, baselines and trend logs. If it cannot be measured, it is not an outcome.
Loxone Group
A platform built over 15 years.
Loxone Group has been building the automation platform since 2009. The group mission is to make buildings simpler to operate, more comfortable and more energy-efficient.


- Founded in Austria in 2009
- 100+ countries through partners
- 30,000+ projects on the platform

05 / Global & local
Global platform. Local engineering.
Loxone Group builds the automation platform in Austria. Our team specifies, configures and commissions it for real buildings from Guangzhou — with the documentation, training and support that operators need after handover.
- Austrian platform engineering
- Guangzhou-based project delivery
- English and Chinese documentation
- Commissioning and operator training


Work with us
Bring us the building.
Tell us the stage, the systems and the outcome. We will tell you what the architecture should look like.