The Hotel Club Sunway Punta Prima in Es Pujols, Formentera, rebuilt its rooms around one Miniserver per room. The system links door access, bathroom, bedroom and terrace, switches the room controls into the guest's language at check-in and connects to the hotel's reservation system, while presence, window and energy monitoring support central management.
Location
Es Pujols, Formentera, Spain
Building type
Hotel
Year
2026
Delivery partner
LOXHOME INTEGRACIONES, SL
01 / Challenge
What the project had to solve.
The renovation had to give every guest a comfortable, personal and simple room experience while helping the hotel save energy and manage each room centrally. Keyless access, efficient climate control, scene lighting, audio and security all needed to work together and with the reservation system, rather than as separate systems managed room by room. The brief also covered arrivals: a room prepared automatically, set to the guest's language, and a welcome sequence that works without extra effort at reception.
02 / Response
How the system was delivered.
Each room runs its own Miniserver covering entrance, bathroom, bedroom and terrace. The Sunway reservation system sends booking data through an API, so check-in prepares the room automatically and Touch Pure Flex switches to the guest's language, with a welcome sequence on arrival. NFC Code Touch at the entrance and terrace handles keyless access, and a card reader detects occupancy. Lighting scenes, presence sensors, motorised curtains, Bluetooth audio, climate shutoff when a window is open, smoke detection, per-room energy metering and a Room Availability mode complete the room.
Planning reference
Typical ranges for this building type.
Industry planning references, not measured results from this project. Point counts, durations and scope must be confirmed with a point schedule and site survey.
| Measure | Typical range |
|---|---|
| Point density | 25–60 points per guest room |
| Commissioning window | 8–16 weeks for a 100-key hotel |
| Typical scope | Guest room control, HVAC, access, energy metering and PMS events |
| Documentation focus | Room templates, guest-mode matrix, PMS event map and handover pack |
Systems in scope
- Lighting
- Shading
- Heating
- Cooling
- Access
- Energy
- Audio
- Security

“We chose Loxone because one system per room can integrate access, lighting, climate, audio, security and energy, and connect to the hotel's reservation system. Guests get an intuitive room in their own language, and the hotel cuts consumption while managing every room centrally.”
Project information is adapted from Loxone Group reference material; the project was delivered by the named partner. This page presents the content locally, without sending visitors to an external product site.