Glossary
The language of building intelligence.
A working glossary for owners, consultants and integrators — the terms that show up in an IBMS scope, a point schedule or a commissioning meeting.
Plain definitions, not acronym soup.
Fundamentals
06- IBMS
- Intelligent Building Management System: the integration layer that unifies building subsystems into one operating picture.
- BMS
- Building Management System: the plant-level system that controls HVAC, lighting and other building services.
- BAS
- Building Automation System: the control system for mechanical and electrical services, often used interchangeably with BMS.
- Point schedule
- The list that defines every point, its address, range, alarm limits and naming.
- Interlock
- A rule that makes one system respond to an event in another, such as access opening a room and triggering lighting and HVAC.
- Trend log
- A time-stamped history of a point or group of points, used for analysis and performance review.
Protocols
08- BACnet
- An open building-automation protocol used by plant, AHUs and BMS; BACnet/IP runs over Ethernet.
- Modbus
- A simple serial or TCP protocol widely used by meters, inverters, sensors and PLCs.
- KNX
- A building-control standard for lighting, shading and room control, common in Europe.
- DALI
- A digital lighting protocol for dimming and addressing individual luminaires.
- DMX
- A lighting-control protocol used for theatrical, architectural and scene lighting.
- 1-Wire
- A low-speed bus for sensors such as temperature probes.
- EnOcean
- A wireless, energy-harvesting protocol for sensors and switches.
- REST API
- A web interface for exchanging data with a system, typically over HTTPS.
Systems & roles
05- HVAC
- Heating, ventilation and air conditioning: the plant and distribution that control temperature, humidity and fresh air.
- RCU
- Room Control Unit: the in-room controller that coordinates lighting, HVAC, shading and service requests in a hotel guest room.
- PMS
- Property Management System: the hotel front-office system that manages reservations, check-in and check-out.
- OCPP
- Open Charge Point Protocol: the standard for communicating with EV charging stations.
- Access control
- The system that manages who can enter which door, when, and records the event.
Performance & health
07- Setpoint
- The target value a control loop maintains, such as 22 °C or 600 ppm CO2.
- Alarm rationalisation
- The process of reducing, ranking and grouping alarms so operators can act on what matters.
- CO2
- Carbon dioxide concentration, a proxy for ventilation and occupancy; high-performance targets are below 600 ppm.
- PM2.5
- Fine particulate matter; high-performance targets are below 15 ug/m3.
- TVOC
- Total volatile organic compounds; high-performance targets are below 0.4 mg/m3.
- Demand-controlled ventilation
- A control strategy that modulates fresh air based on CO2, occupancy or air quality.
- Baseline
- The reference consumption or performance against which savings and operation are measured.