Skip to content

Reference application

Two hundred apartments, one comfort standard.

A coastal residential and resort development where apartment comfort, shared amenities and building access run on one platform.

Seaside resort at dusk

Location

Budva, Montenegro

Building type

Residential & resort

Scope

200 luxury apartments

Platform

Loxone local-first automation

The brief

Residential scale, hospitality expectations.

A residential resort has to deliver a consistent comfort standard across hundreds of apartments while keeping shared infrastructure and access under control. The operator needs a view of the whole building without asking residents to manage a Building Management System.

This reference application shows how apartment-level control, shared-area automation and access can sit on the same architecture.

01 / Need

What the building needs

Comfort at apartment scale, visibility at building scale.

  • Apartment-level climate, lighting and shading that residents can use without training.
  • Shared-area automation that follows occupancy and season.
  • Access and building systems that the operator can supervise remotely.

02 / Response

What the platform does

Local control in each apartment, one view for the operator.

  • Apartment controllers run climate, lighting and shading locally.
  • Shared systems and access events are supervised at building level.
  • Energy and comfort data can be reviewed across the portfolio.

Spaces

The spaces inside the project.

Project photography and representative interior references.

Seaside terrace at dusk
Terrace
Modern residential living room
Interior reference
Residential bedroom with integrated lighting
Room reference

Reference application from the global Loxone network. Photography courtesy of Loxone Group; interior imagery is representative of the platform application. Scope varies by site.

Last reviewed: 2026-11-03

03 / Demonstrates

What it demonstrates

  • Residential automation can be simple for residents and legible for the operator.

  • Apartment-level control can remain independent of the central network.

  • A consistent comfort standard is possible across a large residential building.

City skyline at sunset

Your building next

A reference is useful when it resembles your problem.

Tell us the building type, the systems in scope and the operator model. We will point to the closest reference and explain what would be different.