Skip to content
City Walk apartment interior

Apartment

City Walk Apartment

A small City Walk apartment overlooking the Downtown skyline runs lighting, climate, curtains, sheers and audio from one glass panel in each room. One-touch scenes for mornings, dining and entertaining set the whole home at once, and the curtains open automatically each morning. The technology stays in the background and follows the owner's daily routine.

Location

Dubai, UAE

Building type

Apartment

Year

2021

Delivery partner

ModoSmart Technologies Co. LLC

01 / Challenge

What the project had to solve.

The brief was full automation for a small apartment on a tight budget. Every room still needed lighting, climate, curtains, sheers and audio on one simple interface, with scenes that bring the whole home together for mornings, dining and entertaining. The owner wanted the technology to disappear into daily life rather than add another app, another remote and another set of instructions, so the system had to be complete without becoming complicated or expensive to run.

02 / Response

How the system was delivered.

One glass control panel in each room runs lighting, climate, curtains, sheers and audio. One-touch scenes for mornings, dining and entertaining set everything together, and the curtains open automatically each morning. The home follows the owner's routine without requiring attention: the technology stays in the background, and the interface remains the same from room to room. The scope covers lighting, climate, shading, audio, scenes and glass touch panels in every room.

Planning reference

Typical ranges for this building type.

Industry planning references, not measured results from this project. Point counts, durations and scope must be confirmed with a point schedule and site survey.

MeasureTypical range
Point density15–40 points per apartment
Commissioning window6–12 weeks
Typical scopeLighting, shading, climate, access and apartment metering
Documentation focusApartment templates, riser schedules, metering map and resident guide

Systems in scope

  • Lighting
  • Climate
  • Shading
  • Audio
  • Scenes
City Walk apartment interior

“Loxone lets this home run lighting, climate, shading and audio from one simple panel with a wonderful user interface.”

Project information is adapted from Loxone Group reference material; the project was delivered by the named partner. This page presents the content locally, without sending visitors to an external product site.

Back to case studies