How we work

From audit to operating year.

A four-stage delivery model with explicit deliverables, roles and client inputs.

The model

Clear scope. Clear handover.

IBMS projects fail when responsibilities are vague. Our delivery model makes the boundary explicit: what we do, what you provide, and what the building team owns after handover.

It is deliberately sequential. Each stage produces a document the next stage depends on, so decisions are made once, with the right people in the room.

01
Campus render

Discover & audit

We map the systems, protocols, existing pain points and the decisions the building needs to support.

Deliverables

  • System and protocol inventory
  • Interface and point-schedule gap list
  • Scope and risk register

Client inputs

  • Existing drawings and system lists
  • Access to the facility team
  • Current pain points and priorities
02
Loxone app dashboard on a tablet

Design the architecture

We turn the audit into a layer diagram, integration matrix and an alarm philosophy the project can be priced and built against.

Deliverables

  • Layer and network architecture
  • Integration matrix
  • Alarm and interlock philosophy
  • Scope of responsibilities

Client inputs

  • Sign-off on scope and priorities
  • Consultant coordination
  • Budget and programme constraints
03
Office lobby with green accent lighting

Deliver & commission

Configuration, graphics, interlocks, testing and operator training — with the building team, not around them.

Deliverables

  • Configured platform and graphics
  • Tested interlocks and alarms
  • Operator training and documentation
  • Commissioning records

Client inputs

  • Site access and power/network
  • Third-party vendor coordination
  • Operator availability for training
04
Office building illuminated at night

Operate & optimise

Trends, energy baselines, alarm review and continuous tuning against the outcomes the project signed up for.

Deliverables

  • Performance baseline and trend review
  • Alarm and setpoint tuning
  • Quarterly optimisation report (optional)

Client inputs

  • Operating data and feedback
  • Access to trend history
  • A named operations owner

01 / Roles

Who does what.

The model only works when the boundary is written down.

RoleResponsibility
Owner / developerDefines the outcome, approves scope and budget, owns the data.
MEP consultantCoordinates disciplines, reviews the design and manages the tender.
Loxone Intelligent BuildingAudits, designs, configures, commissions and trains.
System integratorDelivers subsystem interfaces and site works under an agreed scope.
Facility teamRuns the building, validates alarms and adopts the operating model.

02 / Client inputs

What we need from you.

System list

The subsystems, vendors and versions already installed or specified.

Drawings and schedules

Single-line diagrams, network drawings, point schedules and floor plans.

Operating model

Who runs the building, where they sit, and what they need to see.

The outcome

The result the project will be measured on: energy, comfort, compliance, headcount or reporting.

03 / After handover

The building keeps learning.

Handover is not the end of the model. Trends, alarms and energy data are reviewed against the baseline, and the operating logic is tuned as the building settles.

  • A documented baseline

  • An alarm review cadence

  • A change-control path for setpoints and schedules

About

04 / FAQ

Questions, answered

The things owners, consultants and integrators ask us most.

How long does a project take?
It depends on scope and building size. After the audit we define milestones and a commissioning sequence. A single building with six to ten subsystems typically moves through the stages in phases.
Can you work with our existing integrator?
Yes. We can lead the integration or work under your MEP consultant, with responsibilities defined in the scope.
Do we need to replace our BMS?
No. The platform integrates existing systems through open protocols and gateways. Replacement is a commercial decision, not a precondition.
What do you need from us to start?
The system list, existing drawings, access to the facility team and a clear outcome. The audit confirms what is missing.
What happens after handover?
We can provide a defined optimisation period, trend reviews and change control. The building team owns the platform; we support the operating model.