
Retail & chains
Every site, one standard.
For chains that need the same operating logic, remote visibility and energy control at every location.
Quick answer
Retail, restaurant and service chains that need the same automation standard, remote visibility and energy control across every location.
1 — automation standard across sites · Remote — alarm and energy visibility · Local — control in every location
1
automation standard across sites
Remote
alarm and energy visibility
Local
control in every location
01 / The challenge
The daily reality
A chain grows one site at a time. Without a standard, every opening adds a new integration, a new interface and a new way to fail.
Every site is commissioned differently.
Energy and faults stay invisible until a bill or a complaint arrives.
A local change can break the standard for the next opening.
02 / Scope
What we bring into one model
Typical scope for a retail or restaurant chain. Final scope follows the audit.
Lighting & signage
Schedules, scenes and facade or signage lighting.
HVAC & ventilation
Comfort and kitchen ventilation by site profile.
Access & alarm
Opening and closing, staff access and alarm status.
Energy meters
Site-level consumption and baselines.
Audio & announcements
Zone audio and scheduled announcements.
CCTV
Camera health and event linkage.
03 / Outcomes
What changes for the operator
What the operating team actually feels after go-live.
A repeatable site template
The same control logic, graphics and alarm philosophy for every opening.
Remote visibility
Alarms and energy from every site in one view.
Energy per site
Consumption benchmarked across locations and site profiles.
Faster openings
Commissioning follows a known sequence instead of being reinvented.

Exterior
Spaces
What it looks like in the space.
From façade to room interior, the same integration logic.



04 / On the platform
How the solution lands on the three layers.
One architecture, tuned to the building type and operating model.
Application
Dashboards, mobile access, reports, tenant and guest views, portfolio rollups. Every role sees the building at the resolution it needs.
Supervision
The integration core normalises every subsystem into a common object model, then applies schedules, interlocks, alarm routing and audit logging.
Device
Loxone controllers and gateways connect the plant room, the floor and the guest room. Control stays local; the platform supervises.
05 / FAQ
Questions, answered
The things owners, consultants and integrators ask us most.
Can each site keep local control?
How do you handle different kitchen equipment?
Can we roll it out in phases?
Do we need the same hardware at every site?
06 / Related
The same architecture, another building.

Commercial & workplace
One building, many tenants, one operating picture.
Offices, campuses and mixed-use assets where facility teams need to run HVAC, lighting, access and energy as one system.
Explore
Energy & carbon
Measure the building. Then move it.
Metering, PV, storage and EV charging brought into one energy model, with the controls to act on it.
Explore
Next step
Bring us the building. We will bring the operating picture.
Share the project stage, the systems in scope and the outcome you need. Our engineers will map the shortest path to a working IBMS.