Loxone · Indonesia
Loxone Installation in Indonesia
Loxone installation in Indonesia: 220/230 V 50 Hz power, humidity, seismic mounting, grid variation, inter-island logistics and handover.
What the installation covers
Installation covers survey, a tagged point schedule, panel layout and assembly, device mounting, cabling and termination, network setup, controller configuration, point-to-point and functional testing, training and the as-built pack. Indonesian projects range from Jakarta offices and malls to Bali resorts and industrial estates, and some sites are on islands with their own shipping and technician logistics. The survey records the base-build interfaces, the existing systems and the equipment that must keep running. Chillers, air handling units, fan coils, pumps, lighting, shading, energy meters and access interfaces are typical. Seismic restraint also affects the delivery sequence, because anchored equipment needs inspection before ceilings close. Each package has its own test record and acceptance.
- Survey, tagged point schedule and panel design
- Base-build and existing system interfaces recorded
- Seismic anchoring inspected before ceilings close
Humidity, seismic risk and site conditions
Indonesian installations are planned for high humidity, seismic risk and, on some sites, volcanic dust and coastal salt air. These are planning considerations for the specific project. Panels and field devices are anchored for the seismic zone, with flexible connections at equipment and cable supports that allow movement without pulling terminations. Batteries and network cabinets are restrained as well as panels, and flexible connections protect terminations during movement. Humidity control, anti-condensation heaters and ventilation are specified for plant rooms and ceiling voids. Field devices use suitable IP ratings, and external mounting details shed rain. Anchorage details are signed off by the structural engineer for each equipment type, and the inspection is recorded before commissioning. On remote islands, the design favours fewer site visits and more pre-tested, pre-labelled assemblies.
- Seismic anchoring for panels, batteries and cabinets
- Flexible connections at equipment interfaces
- Pre-tested assemblies for remote islands
Power, earthing and network
The supply is 220/230 V, 50 Hz. The 50 Hz basis is recorded, and voltage-sensitive equipment is checked against the site's observed supply quality. Voltage variation, dips and short outages occur in some areas, so controllers and network equipment sit on UPS-backed circuits, and critical plant is coordinated with the generator and automatic transfer switch where provided. Surge protection is installed at the service entrance, at panels and on signal lines. Earthing and bonding follow the electrical consultant's design, with particular attention to seismic and lightning protection. The control network uses a documented IP plan, separate VLANs and a VPN route for remote support. Fibre or cellular backup is agreed with the owner's IT team where continuity matters.
- 220/230 V, 50 Hz with supply quality checks
- UPS-backed controls and generator coordination
- Surge protection and documented IP plan
Approvals, customs and logistics
Approvals are confirmed for each project; no standing approval, registration or certification is claimed. Typical review streams include the building permit, fire safety, the utility connection and environmental requirements. Drawings, equipment schedules and interface documents are prepared for the consultant or contractor to submit. Imported panels and devices need customs documentation, tariff codes and conformity records, and inter-island projects need a shipping plan that matches the construction sequence. Spares and special tools are shipped with the main order where possible. For remote islands, a pre-shipping inspection is agreed so that missing parts are found before the container leaves, and the programme assumes longer delivery and technician travel times.
- Approvals confirmed per project, not assumed
- Customs, conformity records and inter-island shipping
- Pre-shipping inspection for remote islands
Typical project types
Typical work includes offices and commercial towers, shopping malls, hotels and resorts, residential towers, industrial estates, schools, hospitals and public buildings. Each has a different operating pattern and a different tolerance for shutdowns. A resort may need room-by-room commissioning around occupancy; a factory may need shutdowns tied to production; a mall may need night works. The installation plan and the point schedule follow those constraints. Seismic zones also affect the mounting schedule, because bracing, anchorage and inspection take time that a standard installation programme does not allow for. The programme is issued only after those constraints are agreed with the operator.
- Offices, malls, hotels and resorts
- Residential, industrial, schools and hospitals
- Seismic anchoring built into the schedule
Delivery model and handover
Engineering, panel design, configuration and commissioning planning are coordinated remotely with the consultant and contractor. Site installation is delivered by the local contractor working to issued drawings and test records, with remote support and, where agreed, attendance for commissioning and witness testing. Documentation is prepared in English with Bahasa Indonesia summaries where the operator team needs them. Handover includes as-built drawings, the point schedule, control narratives, alarm lists, network diagrams, backups and signed test records. Training is task-based, and a support path covers the defects period and the first wet season, with remote diagnostics used where travel to the site is slow. A short open-items list is closed before final acceptance.
- Remote engineering with local installation
- English documentation with Indonesian summaries
- Remote diagnostics for slow-to-reach sites
Indonesia planning considerations and responses
9 rows| Planning area | Indonesia consideration | Design and delivery response |
|---|---|---|
| Humidity | High humidity and condensation in plant rooms | Anti-condensation details, heaters and ventilation |
| Seismic risk | Equipment movement and cable strain | Anchoring, flexible connections and restrained cabinets |
| Grid quality | Voltage variation, dips and short outages | UPS-backed controls, generator coordination and surge protection |
| Power | 220/230 V, 50 Hz supply | 50 Hz basis recorded and sensitive equipment checked |
| Approvals | Building permit, fire safety, utility and environment | Submittals coordinated per project; no standing approval claimed |
| Logistics | Inter-island shipping and customs clearance | Pre-shipping inspection and delivery plan tied to construction |
| Remote sites | Long technician travel and slow replacement parts | Pre-tested assemblies and remote diagnostics |
| Coastal and volcanic areas | Salt air and volcanic dust | Corrosion-resistant fixings, sealed enclosures and filters |
| Commissioning | Occupied resorts, malls and factories | Phased tests by room, zone or production window |
Project images
3 images


Frequently asked
01Do you have a local office or partner in Indonesia?
We do not claim a local office, partner or registration. Engineering and configuration are coordinated remotely, and site installation is delivered by a local contractor confirmed for each project. Responsibilities are written into the scope.
02How is equipment fixed for seismic movement?
Panels, batteries and network cabinets are anchored to the structure, and equipment interfaces use flexible connections so that movement does not pull terminations. The restraint details are coordinated with the structural engineer for the site's seismic zone.
03Can the system run through voltage dips?
Controllers and network equipment are on UPS-backed circuits, so logs and safe states survive short interruptions. Critical plant is coordinated with the generator and ATS where provided; the exact ride-through time depends on the UPS and battery selected.
04Who handles permits and customs?
The consultant or contractor normally submits permits and coordinates inspections. Customs clearance is handled by the importer of record. We provide drawings, equipment schedules, interface documents and test records, and confirm requirements per project.
05How is installation priced?
Pricing follows the point schedule, panel count, site conditions and commissioning scope. Country rates are not published; the method is explained on the pricing page and confirmed in a written quotation after scope review.
06What support is available on remote islands?
Remote diagnostics, a documented spares list and task-based training for the building team. Where attendance is agreed, travel and mobilisation time are planned into the support scope rather than treated as an emergency.
Next step
Bring us the building.
Tell us the building type, systems in scope and the outcome you need. We will map the shortest path to a working system.