Aller au contenu
Engineering workstation with control software

Comparaison

Alternative DDC Platforms — What to Compare

When an alternative DDC platform is worth evaluating, what to compare, and where staying with the incumbent is the better engineering decision.

01

When to look at an alternative

Switching platforms is expensive, so the reason should be concrete. The usual triggers are spares that take months, licences that renew per seat and per site, a tool that only the original integrator can open, a protocol set that no longer matches the plant, or support that is far away. A preference for a different brand is not on that list. If the existing system runs, is documented and can still be maintained, the engineering answer is usually to keep it and fix the specific constraint.

02

What to compare, in order

First BACnet conformance: which objects and services the controller exposes, and whether it holds the profile the specification names. Second, the engineering tool: licence model, whether project files are readable without a subscription, and whether a third party can take over. Third, capacity and headroom per controller. Fourth, the alarm and schedule model, because that is what the operator touches every day. Fifth, spares and lifecycle commitments in writing. Price comes last, because a lower unit price on a platform that consumes engineering hours is not a saving.

03

Where switching actually hurts

The cost is not the controller. It is the graphics library, the alarm database, the site-specific sequences nobody documented, the technicians who know where the traps are, and the maintenance contract that may not transfer. On a single building the disruption is manageable; across a campus with a shared head-end it can take years. Any business case should count those hours, not just the hardware delta.

04

Migrating without a rip-out

Most successful migrations are phased. Existing controllers stay until they fail or until a subsystem is renovated; new work adopts the target platform; a supervisory layer reads both over BACnet or Modbus so the operator still sees one picture. That lets a client test the new tool on one floor before committing the estate. The prerequisite is a point map that does not depend on either platform, which is worth building before any decision is made.

05

Trademarks and independence

Honeywell, Siemens and Schneider Electric are trademarks of their respective owners. We are an independent integrator and panel builder; we are not affiliated with, authorised by or endorsed by any of them, and we do not claim equivalence between products. Names appear here so that a reader searching for alternatives can find an engineering discussion rather than a sales page. Where a project already standardises on one of these platforms, we will say so in the proposal.

Evaluation criteria for any DDC platform

8 rows
CritèreWhat to askPourquoi c’est important
BACnet conformanceWhich objects and services, which profile, is the PICS publishedDecides whether integration is native or gateway work
Outil d’ingénierieLicence model, file format, can a third party open the projectDecides whether you are locked to one integrator
Point capacityPoints per controller, bus device limits, spare headroomDecides how much hardware and how many change orders
Alarm and schedule modelAlarm classes, deadbands, editable schedules, trend retentionDecides daily operator effort
Lifecycle and sparesPublished availability, replacement path, local stockDecides the cost of year five, not year one
Migration pathCan old and new controllers coexist on one supervision layerDecides whether a campus change is phased or all at once
Documentation et réceptionAs-built format, point naming, training languageDecides whether the next team can run it
Local supportWho responds on site, in what language, how fastDecides downtime when something fails at 02:00

A phased migration that survives handover

5 rows
PhaseWhat happensDone when
1 InventoryPoint list, protocols, controller models, tool accessA point map that depends on no vendor tool
2 Parallel readNew platform reads the existing system without writingBoth systems visible in one operating picture
3 PilotOne floor or one subsystem switches overAlarms, schedules and trends match
4 RolloutRemaining scope replaced on the renovation cycleSpares and documentation updated together
5 Close-outOld platform retired or kept as sparesOne maintenance model, one set of documents

Images du projet

3 images
Tableau de bord d’automatisation du bâtiment sur une tablette
Une vision d’exploitation unique
Bureau paysager avec éclairage et protection solaire automatisés
Automatisation de bureau
Ingénieur configurant un logiciel d’automatisation du bâtiment
Configuration

Questions fréquentes

01Are you a distributor for any of these brands?

No. We are an independent integrator and panel builder. We work with the platforms a project specifies, including the five product lines we describe on this site, and we do not hold distributor or authorised-partner status with Honeywell, Siemens or Schneider Electric.

02Can you take over an existing Honeywell or Siemens system?

It depends on the tool access. If the project files and engineering access are available, we can audit, document, extend and commission changes. If they are locked to another party, we will say so before quoting rather than discover it during commissioning.

03Is an alternative always cheaper?

No, and treating it as a price exercise is how migrations fail. The saving usually comes from licence structure, spares and engineering hours over several years; the cost comes from retraining, rewritten graphics and undocumented sequences. Compare the five-year total for the specific building.

04Which platform would you recommend for a new building?

That depends on the specification, the plant and who will maintain it. For a consultant-led building with a BACnet requirement, a mainstream DDC line with published conformance and open project files is the safe default. For a villa or small hotel, a simpler local-first line may serve better. We give a recommendation with the reasoning, not a brand preference.

05Do you disclose which platforms you work with most?

Yes, in a proposal. What we will not do is present one platform as the only correct answer, or use a client's existing brand as a reason to replace working equipment.

06What if our consultant specifies one of these brands?

Then we work to the specification where we can, and say plainly where we cannot. A proposal that quietly substitutes a platform is worse for everyone than one that names the deviation and prices it.

Étape suivante

Apportez-nous le bâtiment.

Indiquez le type de bâtiment, les systèmes concernés et le résultat dont vous avez besoin. Nous tracerons le chemin le plus court vers un système opérationnel.